Establish the project context

Share the building plans, proposed use and any existing fire safety design information. For an alteration, identify the affected area and available records of the existing sprinkler installation. The designer can then establish the information required for the assessment.

Coordinate supply, layout and equipment

Water supply information, pipe routes and equipment locations are connected design inputs. Coordination with structural elements, ceilings and other services helps make the proposed system understandable within the building.

Define the documentation

The agreed package may include coordinated drawings, equipment schedules, valve arrangements and supporting design information. Confirm the applicable requirements and edition references with the responsible designer for the specific project; a general website guide cannot establish the required system.